May 2014
We have now completed painting the
inside of the hull, and having sanded back the 2 coats applied by hand we have
sprayed on the final coat(s). Fedoa is now feeling like a new boat being fitted out rather than an old one being patched up.
Having drilled for the stern tube
earlier in the year it was a fairly quick job to get this installed, and from
there we were able to fabricate a steel thrust plate and fit our rear coupling
for the shaft.
More work has been done on the
interior bulkheads and floor bearers so all the cabins are now demarcated, and we have worked out the best layout for the companionway staircase, with a mock-up installed last week which we can use for access into the boat. We are very happy with the layout, with
generous cabins throughout.
Looking ahead, we will be fitting the first 2 layers of the deck on this month; a layer of tongue and groove cedar, followed by a layer of ply sheathed with glass cloth and epoxy. We are also aiming to get the engine fully installed so we
can get the shaft / aquadrive fitted and all the fuel tanks templated / made up ready to be plumbed in next month so the
interior fitout can begin in earnest.