June / July 2014
In June most of our hours went into the deck, with the cedar and ply down, and the whole thing faired and sheathed with epoxy / fibreglass by the end of June. This is now ready for the cedar and teak laid deck which we have decided to do after the interior fit out to minimise the risk of it getting damaged. The other time consuming job that was finished in June was splining the topsides, which is now finished so the hull is ready for fairing.
We have got
most of the cabin sole fitted this month, using solid iroko boards to give us a
base to build the furniture off. With
basic wiring in and tanks in position we now have the basic cabin layout
installed. A traditional finish
throughout the boat in keeping with the original is going to include tongue and
groove panelling, fielded panels, and raised and fielded panels, some being
painted and some varnished depending on the use of the cabin / area.
Other jobs
have included preparing the area under the cockpit for the generator, which
will be fitted in August, and making the cockpit itself. Also, starting to fit the plumbing and galley
systems below floor level before too much is built in over the top. We are making great progress and are still on
target to get the majority of the interior joinery finished, the electrical and
mechanical systems installed and be finishing off the deck by the end of the
year.